UPDATE 12/10/07: Hotfix as described in MSDN KB929816 solved the problem for us mentioned below. Obtain the hotfix and then install on each server on the farm. Toe, sharepoint configuration utility on each server. Here is the MS Support link for that KB: http://support.microsoft.com/kb/932816.
Agtergrond:
Ons het 'n besigheid vereiste waar 'n omgewing ingenieurswese bestuurder nodig het om te verseker dat 30 some-odd manufacturing locations located throughout the United States needs to ensure that those plants file for their various state-mandated permits in a timely fashion. One approach we’ve investigated leverages the "Pause Until Date" activity available to us via SharePoint Designer worfklow. The engineering manager (of haar assistent.) enters all the required permits and reminder dates at the start of the year. The system then does all the heavy lifting.
Omgewing:
MOSS, 64 bietjie, virtuele masjien omgewing (ontwikkeling boks), 2 servers (SQL op bediener #1, alles op bediener #2).
Probleme:
The Pause Until Date action seems like the perfect solution and it may well prove itself to be. Egter, dit werk nie goed uit die boks (vir ons).
- Die workflow taak is nie om te hardloop, ever. I discovered this by reading through Christopher White se (http://chrissyblanco.blogspot.com/2007/06/issues-with-delay-activity-in-moss.html) excellent write-up by using stsadm thusly:
C:\>stsadm -o getproperty -propertyname "job-workflow" -url http://localhost
<Property Exist="No" />
C:\>
Dit was 'n verrassende uitslag, maar maklik opgelos:
C:\>stsadm -o setproperty -propertyname "job-worfklow" -propertyvalue "every 1 minute tussen 0 en 59" -url http://localhost
Operasie suksesvol voltooi.
C:\>
By dit te doen, the first "In Progress" workflow vinnig afgedank word en het dit se werk.
- Ongelukkig, the next one didn’t work as expected. Gelukkig, Christopher refers us hier (http://support.microsoft.com/kb/932816). As of writing of this entry, ons wag vir die IT-afdeling te verkry dat die hotfix, but it does look promising. Our copies of the affected .dll’s do not share the same byte size, so hopelik sal dit die probleem op te los.
Work Around:
Re-running the stsadm -o setproperty command seemed to prod the workflow timer awake. It would, ongeveer 7 minute later, actually wake up and continue along with the workflow.
Vrae / Kwessies:
Stop Tot Datum werk nie.
Stop Tot Datum hervat nie.
Workflow status does not change from "In Progress"
Workflow status stays "In Progress"
Hey Paul.. Dont weet as jy volg of nie. Ek het die breek kwessie. Ek het ook 3.5 SP1 wat ook installeer 3.0 SP2 raamwerk. So wanneer ek probeer om die warm fix uit te voer, dit is dat dit nie kan vind om die produk te werk. Ek het ook mos SP2 geïnstalleer. Nog steeds die vertraging. Ek afgeruk 3 en 3.5 raamwerk en installeer. Nog steeds die dealy…maar dit neem nogal 'n paar loops / wag voordat dit gebeur. Enige ander voorstelle?
dankie..
http://www.sskbank.com
Ek skep 'n herinnering workflow met behulp van SharePoint Designer, en toe ek gebruik "Stop Tot Datum" aktiwiteit. It doesn’t resume and Workflow status does not change from "In Progress".
(d.w.z. dit gee "Laat wag vir 0 minute" net, onder Workflow Geskiedenis nie, maar dit neem nie 'n bepaalde aksie).
Ek het 'n paar googlen vir wat in die afgelope 4 dae, en van daar af het ek het 'n warm fix - KB 932394 en geïnstalleer het, maar nog steeds ek is in dieselfde moeilikheid met 'n "Pause tot op datum" aktiwiteit.
Ek het ook verander "werk-workflow" tydsduur gebruik van stsadm opdrag van 5 minute om te 1 minute soos hieronder:
Wat moet ek doen vir hierdie?
Please suggest me why "Pause Until Date" doesn’t resume and Workflow status does not change from "In Progress" in my workflow.
Ek ondervind hierdie probleem in SP 2010. Ek het al gebons my kop teen die muur vir byna 'n week probeer om op te los – tevergeefs. Het jy 'n meer onlangse inligting oor hierdie “breek tot datum” aktiwiteit nooit vorder?
Sorry for never responding. Ek hoop dat jy die oorsaak van jou probleem gevind.