Fadhbanna le “Sos Go dtí Dáta” gníomhaíocht i sreabhadh oibre SPD-cruthaíodh

Suas chun dáta 12/10/07: Hotfix as described in MSDN KB929816 solved the problem for us mentioned below. Obtain the hotfix and then install on each server on the farm. Ansin,, sharepoint configuration utility on each server. Here is the MS Support link for that KB: http://support.microsoft.com/kb/932816.

Cúlra:

Tá riachtanas gnó nuair is gá bainisteoir innealtóireachta comhshaoil ​​a chinntiú go 30 some-odd manufacturing locations located throughout the United States needs to ensure that those plants file for their various state-mandated permits in a timely fashion. One approach we’ve investigated leverages the "Pause Until Date" activity available to us via SharePoint Designer worfklow. The engineering manager (nó a cúnta) enters all the required permits and reminder dates at the start of the year. The system then does all the heavy lifting.

Comhshaol:

CAONAIGH, 64 giotán, timpeallacht meaisín fíorúil (bosca forbartha), 2 freastalaithe (SQL ar an bhfreastalaí #1, gach rud eile ar an bhfreastalaí #2).

Fadhbanna:

The Pause Until Date action seems like the perfect solution and it may well prove itself to be. Mar sin féin, ní oibríonn sé go maith as an bhosca (dúinn).

  1. Ní raibh an post sreabhadh oibre sceidealta a reáchtáil, ever. I discovered this by reading through Christopher White (http://chrissyblanco.blogspot.com/2007/06/issues-with-delay-activity-in-moss.html) excellent write-up by using stsadm thusly:

    C:\>stsadm -o getproperty -propertyname "job-workflow" -moladh http://localhost

    <Property Exist="No" />

    C:\>

    Ba é sin de bharr iontas ach go héasca réiteach:

    C:\>stsadm -o setproperty -propertyname "job-worfklow" -propertyvalue "every 1 nóiméad idir 0 agus 59" -moladh http://localhost

    Oibríocht i gcrích go sásúil.

    C:\>

    Ar déanamh sin, the first "In Progress" sreabhadh oibre fired suas go tapa agus rinne sé post.

  2. Faraor, the next one didn’t work as expected. Thankfully, Christopher refers us anseo (http://support.microsoft.com/kb/932816). As of writing of this entry, táimid ag fanacht leis an roinn TF sin a fháil hotfix, but it does look promising. Our copies of the affected .dll’s do not share the same byte size, mar sin tá súil againn go mbeidh sé seo an fhadhb a réiteach.

Workaround:

Re-running the stsadm -o setproperty command seemed to prod the workflow timer awake. It would, garbh 7 nóiméad ina dhiaidh sin, actually wake up and continue along with the workflow.

Ceisteanna / Ceisteanna Aghaidh:

Ní Sos Go dtí Dáta obair.

Ní Sos Go dtí Dáta atosú.

Workflow status does not change from "In Progress"

Workflow status stays "In Progress"

5 smaointe ar "Fadhbanna le “Sos Go dtí Dáta” gníomhaíocht i sreabhadh oibre SPD-cruthaíodh

  1. Chris Oneslager

    Hey Paul.. Ná a fhios má tá tú monatóireacht nó nach. Tá mé tar éis an tsaincheist sos. Tá mé chomh maith 3.5 SP1 a shuiteáil freisin 3.0 SP2 creat. Mar sin, nuair a thugaim a reáchtáil an shocrú te, tá sé nach féidir é a fháil ar an táirge a thabhairt cothrom le dáta. Tá mé chomh maith caonach SP2 suiteáilte. Fós ag fáil an mhoill. Sracadh mé amach 3 agus 3.5 creat agus reinstall. Fós ag dul ar an dealy…ach a thógann sé go leor cúpla lúb / Waits sula bhfuil sé. Aon mholtaí eile?

    Freagra
  2. Saurabh Singh
    Hi go léir,
    I am creating a reminder workflow using SharePoint Designer, and when I use "Pause Until Date" gníomhaíocht. It doesn’t resume and Workflow status does not change from "In Progress".
    (i.e. it displays "Pausing for 0 nóiméad" amháin, faoi ​​Stair Sreabhadh Oibre ach ní chuireann sé aon ghníomh sonraithe).
    Déanta agam ar roinnt Googling chun gur i deireanach 4 lá, agus ó ann go bhfuair mé a shocrú te - kB 932394 agus suiteáilte sé ach fós tá mé i dtrioblóid chéanna le "Sos Go dtí Dáta" Gníomhaíocht.
    Mé tar éis athrú freisin "post-sreabhadh oibre" aga ama ag baint úsáide as orduithe stsadm ó 5 nóiméad 1 nóiméad mar atá thíos:
    stsadm -o setproperty -propertyname "job-workflow" -propertyvalue "every 1 nóiméad idir 0 agus 59" -moladh http://localhost
    ach fuair fhadhb chéanna.
    Cad ba chóir dom a dhéanamh ar an?
    Please suggest me why "Pause Until Date" doesn’t resume and Workflow status does not change from "In Progress" i mo sreabhadh oibre.
    Go raibh maith agat,
    Saurabh Kumar Singh
    Freagra
  3. Roxanne Whiteis

    I am having this issue in SP 2010. I’ve been banging my head against the wall for almost a week trying to resolve – to no avail. Do you have any more recent information on this “pause until date” activity never progressing?

    Freagra

Leave a Reply

Ní thabharfar do sheoladh r-phoist a fhoilsiú. Réimsí riachtanacha atá marcáilte *