Problemi bil “Pause Sa Data” attività workflows SPD-maħluqa

UPDATE 12/10/07: Hotfix as described in MSDN KB929816 solved the problem for us mentioned below. Obtain the hotfix and then install on each server on the farm. Imbagħad, sharepoint configuration utility on each server. Here is the MS Support link for that KB: http://support.microsoft.com/kb/932816.

Sfond:

Għandna rekwiżit tan-negozju fejn manager inġinerija ambjent jeħtieġ li tiżgura li 30 some-odd manufacturing locations located throughout the United States needs to ensure that those plants file for their various state-mandated permits in a timely fashion. One approach we’ve investigated leverages the "Pause Until Date" activity available to us via SharePoint Designer worfklow. The engineering manager (jew assistent tagħha) enters all the required permits and reminder dates at the start of the year. The system then does all the heavy lifting.

Ambjent:

MOSS, 64 bit, ambjent magna virtwali (kaxxa iżvilupp), 2 servers (SQL fuq server #1, kull ħaġa oħra fuq server #2).

Problemi:

The Pause Until Date action seems like the perfect solution and it may well prove itself to be. Madankollu, ma jaħdimx sew barra mill-kaxxa (għalina).

  1. Ix-xogħol workflow kienx skedat jiddekorri, ever. I discovered this by reading through Christopher White Paper (http://chrissyblanco.blogspot.com/2007/06/issues-with-delay-activity-in-moss.html) excellent write-up by using stsadm thusly:

    C:\>stsadm -o getproperty -propertyname "job-workflow" -url http://localhost

    <Property Exist="No" />

    C:\>

    Dan kien riżultat sorprendenti imma jissolvew faċilment:

    C:\>stsadm -o setproperty -propertyname "job-worfklow" -propertyvalue "every 1 minuta bejn 0 u 59" -url http://localhost

    Operazzjoni kompluta b'suċċess.

    C:\>

    Malli tagħmel dan, the first "In Progress" workflow malajr fired up u ma impjieg huwa.

  2. Sfortunatament, the next one didn’t work as expected. Thankfully, Christopher refers us hawn (http://support.microsoft.com/kb/932816). As of writing of this entry, aħna qed jistennew għall-dipartiment IT sabiex tikseb dan hotfix, but it does look promising. Our copies of the affected .dll’s do not share the same byte size, hekk nisperaw li dan se ssolvi l-problema.

Workaround:

Re-running the stsadm -o setproperty command seemed to prod the workflow timer awake. It would, bejn wieħed u ieħor 7 minuti wara, actually wake up and continue along with the workflow.

Mistoqsijiet / Kwistjonijiet indirizzati:

Pause Sa Data ma taħdimx.

Pause Sa Data ma jerġa 'jibda.

Workflow status does not change from "In Progress"

Workflow status stays "In Progress"

5 ħsibijiet dwar "Problemi bil “Pause Sa Data” attività workflows SPD-maħluqa

  1. Chris Oneslager

    Hey Paul.. Dont know jekk inti monitoraġġ jew le. I am li jkollhom il-kwistjoni pause. Għandi wkoll 3.5 SP1 li wkoll jinstallaw 3.0 qafas SP2. Allura meta I tipprova tmexxi l-jiffissaw hot, huwa ma tistax issib il-prodott li taġġorna. Għandi wkoll ħażiż SP2 installat. Xorta jkollna d-dewmien. I ripped off 3 u 3.5 qafas u jerġa. Xorta jkollna l-dealy…iżda tieħu pjuttost ftit loops / tistenna qabel dan iseħħ. Kwalunkwe suġġerimenti oħra?

  2. Saurabh Singh
    Hi għal kulħadd,
    I am creating a reminder workflow using SharePoint Designer, and when I use "Pause Until Date" attività. It doesn’t resume and Workflow status does not change from "In Progress".
    (I.E. it displays "Pausing for 0 minuti" biss, taħt History Workflow iżda ma tieħu kwalunkwe azzjoni speċifikata).
    I għamlu xi googling għal dak fl-aħħar 4 jiem, u minn hemm I kienet marret jiffissaw hot - KB 932394 u stallat iżda xorta I am fl-istess inkwiet mal "Pause Sa Data" Attività.
    I inbidlu wkoll "job-workflow" durata tal-ħin jużaw kmand stsadm minn 5 minuta sa 1 minuta kif hawn taħt:
    stsadm -o setproperty -propertyname "job-workflow" -propertyvalue "every 1 minuta bejn 0 u 59" -url http://localhost
    iżda sabet istess problema.
    X'għandi nagħmel għal dan?
    Please suggest me why "Pause Until Date" doesn’t resume and Workflow status does not change from "In Progress" fl workflow tiegħi.
    Grazzi,
    Saurabh Kumar Singh
  3. Roxanne Whiteis

    I am having this issue in SP 2010. I’ve been banging my head against the wall for almost a week trying to resolve – to no avail. Do you have any more recent information on this “pause until date” activity never progressing?

Ħalli Irrispondi

Your email address mhux se jkun ippubblikat. Meħtieġa oqsma huma mmarkati *