I-UPDATE 12/10/07: Hotfix as described in MSDN KB929816 solved the problem for us mentioned below. Obtain the hotfix and then install on each server on the farm. Pagkatapos, sharepoint configuration utility on each server. Here is the MS Support link for that KB: http://support.microsoft.com/kb/932816.
Likuran:
Mayroon kaming isang negosyo na kinakailangan sa kung saan ang isang kapaligiran manager engineering Kailangang matiyak na 30 some-odd manufacturing locations located throughout the United States needs to ensure that those plants file for their various state-mandated permits in a timely fashion. One approach we’ve investigated leverages the "Pause Until Date" activity available to us via SharePoint Designer worfklow. The engineering manager (o ang kanyang katulong) enters all the required permits and reminder dates at the start of the year. The system then does all the heavy lifting.
Kapaligiran:
Lumot, 64 kaunti, virtual machine kapaligiran (pag-unlad box), 2 server (SQL sa server #1, lahat ng iba pa sa server #2).
Problema:
The Pause Until Date action seems like the perfect solution and it may well prove itself to be. Gayunman, Hindi ito gumagana ng maayos sa labas ng kahon (sa amin).
- Ang daloy ng trabaho sa trabaho ay hindi naka-iskedyul na tumakbo, ever. I discovered this by reading through Christopher White ni (http://chrissyblanco.blogspot.com/2007/06/issues-with-delay-activity-in-moss.html) excellent write-up by using stsadm thusly:
C:\>stsadm -o getproperty -propertyname "job-workflow" -url http://localhost
<Property Exist="No" />
C:\>
Iyon ay isang kamangha-mangha resulta ngunit madaling malulutas:
C:\>stsadm -o setproperty -propertyname "job-worfklow" -propertyvalue "every 1 minuto sa pagitan ng 0 at 59" -url http://localhost
Ang operasyon ay matagumpay na nakumpleto.
C:\>
Sa paggawa na, the first "In Progress" workflow mabilis fired up at ginawa ito ng trabaho.
- Sadly, the next one didn’t work as expected. Thankfully, Christopher refers us dito (http://support.microsoft.com/kb/932816). As of writing of this entry, kami ay naghihintay para sa IT department upang makuha na hotfix, but it does look promising. Our copies of the affected .dll’s do not share the same byte size, kaya sana ito ay malutas ang problema.
Workaround:
Re-running the stsadm -o setproperty command seemed to prod the workflow timer awake. It would, humigit-kumulang 7 minuto mamaya, actually wake up and continue along with the workflow.
Tanong / Isyu natugunan:
I-pause Hanggang sa Petsa ay hindi gumagana.
I-pause Hanggang sa Petsa ay hindi ipagpatuloy.
Workflow status does not change from "In Progress"
Workflow status stays "In Progress"
Hey Paul.. Wala alam kung ikaw ay pagsubaybay o hindi. Nagkakaroon ako ng mga isyu na i-pause. Din ako ay may 3.5 SP1 na ring mag-install 3.0 SP2 framework. Kaya kapag sinusubukan kong patakbuhin ang mainit na pag-aayos, ito ay hindi ito maaaring mahanap ang mga produkto na i-update. Din ako ay may lumot SP2-install. Nakakakuha pa rin ang pagka-antala. I-off ang bigtal 3 at 3.5 framework at muling i-install. Nakakakuha pa rin ang dealy…ngunit ito ay tumatagal ng lubos ng ilang mga loop / naghihintay bago ito nangyayari. Anumang iba pang mga mungkahi?
salamat..
http://www.sskbank.com
Ako ay ang paglikha ng isang paalala workflow gamit SharePoint Designer, at kapag ginagamit ko ang "I-pause Hanggang Petsa" aktibidad. It doesn’t resume and Workflow status does not change from "In Progress".
(i.e. ito ay nagpapakita ng "Ang pag-pause para sa 0 minuto" lamang, sa ilalim ng workflow Kasaysayan ngunit hindi ito gumawa ng anumang partikular na pagkilos).
Gumawa ako ng ilang mga Pag-Google para sa na sa huling 4 araw, at mula doon ako ay naging isang mainit na pag-aayos - KB 932394 at mai-install ito ngunit pa rin ako ay nasa parehong problema sa "I-pause Hanggang sa Petsa" Aktibidad.
Din ako ay nagbago "trabaho-daloy ng trabaho" tagal ng oras gamit ang stsadm command na mula sa 5 minuto upang 1 minutong bilang sa ibaba:
Ano ang dapat kong gawin para sa mga ito?
Please suggest me why "Pause Until Date" doesn’t resume and Workflow status does not change from "In Progress" sa aking workflow.
Ako ay nagkakaroon ng ang isyu na ito sa SP 2010. Gumagamit ako banging aking ulo laban sa mga dingding sa loob ng halos isang linggo sinusubukan upang malutas – upang hindi mapakinabangan. mayroon kang anumang higit pang mga kamakailang impormasyon sa mga ito gawin “i-pause hanggang sa petsang” aktibidad ay hindi kailanman progressing?
Sorry for never responding. Umaasa ako sa iyo natagpuan ang root sanhi ng iyong isyu.